en
Language
  • en
  • cs
  • hu
  • de
  • fr
  • es
  • br
  • ru
  • kr
  • jp
AI translation
  • it
  • pl
  • tr
1/27/2026

A Case Study of Home Power Solutions with Easy8

Visit website
Industry:

Manufacturing

Date of implementation:

September 2020

Headquarters:

Berlin, Germany

Company size:

Mid-market

Departments using Easy8:

Product Development

Discover the transformative impact of Home Power Solutions as they revolutionize sustainable living with innovative energy solutions, powered by Easy8. This case study delves into Home Power Solutions' pioneering efforts to provide reliable and eco-friendly energy solutions for residential and commercial use. 

Before switching to Easy8

The client used Redmine, which didn’t have a usable resource management feature.

Top challenges:

  • Keep an overview in a very complex organization (lots of teams working on hardware and software of one complex system) and reduce complexity with the tool instead of increasing it.
  • Implementing SAFe framework in Easy8 (i.e. PI-Planning for quarterly planning of epics and SCRUM in between)
  • Combination of long-term planning (waterfall) and short-term sprint planning (SAFe PI-Planning and SCRUM)
  • Resource Management for individuals and teams
  • Summarize information in the tool for reporting
  • Graphs/diagrams (possibilities are very limited)

Our assignment and challenges

Expectations to meet:

  • Reduce complexity in a very complex organization
  • Increase transparency of all tasks that are worked on
  • Enable effective prioritization
  • Consistently representing the hierarchic structure from company vision to individual task
  • Support project planning and steering
  • Support program and team management

Requirements:

  1. Basic project management features: Gantt charts, milestones, tasks, subtasks, responsibilities, and resource estimations are essential components.
  2. Resource management: Including considerations for holidays and other factors impacting resource availability.
  3. Project view: Providing a comprehensive overview of ongoing projects.
  4. Team view: Allowing teams to see all projects they are involved in.
  5. Revision of project plans: Providing the ability to revise project plans as needed.
  6. Critical paths: Identifying critical paths within projects for efficient planning.
  7. Work Breakdown Structure (WBS): Offering a clear breakdown of responsibilities within projects.
  8. Task status tracking: Monitoring the status of tasks throughout the project lifecycle.
  9. Documentation of project results: Facilitating the documentation of project outcomes for future reference.
  10. Reporting and analysis: Generating reports, including milestone trend analysis, and offering reporting templates for different stakeholders with varying levels of detail and KPIs.

Why Easy8:

  • Hybrid project management (agile and waterfall) and resource management
  • Features highlights: 
  • Resource Management
  • Customizability
  • Filters


Phases of implementation:

Before implementation, a test server was created, which was thoroughly tested for the above requirements. Since project management in our company was just about to evolve, the processes and concrete use of the tool were not ultimately defined before implementation. Tailoring Easy8 to our company and improving our project management methods were done simultaneously after starting using the tool. Based on SAFe methodology we continuously increased the efficiency of the PI-Planning using Easy8.

1. Settings

In the first step, a detailed structure of projects was defined and implemented. We also imported all tasks from Redmine, because we wanted to keep access to the knowledge documented in those tickets. 

2. Server solution / Cloud solution

We chose the cloud solution.

3. Training

We trained key users and administrators during the implementation and other users of the application additionally in comprehensive thematic blocks.

4. Testing

The client uses a test environment with real data, which allows new requirements and functions to be tested before deployment to the production environment.


The most used features:

Franz Fürstenberg

Project manager
HPS Home Power Solutions AG
Easy8 has most of the features that we need to support and improve our hybrid project management in a very complex organization. Through periodic updates, the usability is constantly improving over time.


The most used functions


template for development projects and operational tasks


customizable dashboard for tracking results


WBS


Gantt


HPS is a global leader in the development and production of integrated energy storage systems based on green hydrogen for buildings. With the innovative year-round energy storage system called Picea, HPS addresses key areas of the energy transition. Surpluses generated by a photovoltaic system on sunny days are stored as green hydrogen and made available again in the dark seasons in the form of electricity and heat. This enables buildings to be supplied with solar energy from their own roofs throughout the year. HPS has won several prestigious awards for Picea, including the Handelsblatt Energy Award, the Innovationspreis Berlin-Brandenburg, and the Sustainability Challenge of the German Sustainable Building Council (DGNB).

Related case study

10/1/2019

In this case study we provided the history of how In October 2019, Oxford Instruments NanoScience embraced transformation, replacing an outdated system with Easy8. With 200 users across diverse departments, the challenges included an unsupported legacy system. 

Read more

ESONIC Inc. focuses on industrial automation of technological processes and production units. The company was looking for a complex solution for internal and external projects that would streamline their productivity.

Read more

Try Easy8 in 30 days free trial

  • Access all features
  • SSL protected
  • No credit card required