How to Activate and Access WBS on a Project

Introduction

The Work Breakdown Structure (WBS) in Easy8 is a plugin that must be enabled for each project where it is needed. This guide explains how to activate WBS and where to find it once it’s available.

Target Audience

  • User

Prerequisites

  • WBS plugin installed in your Easy8 instance
  • Permission to manage project modules

Steps

1. Enable WBS in Project Settings

To activate WBS for a specific project:

  • Go to the project where you want to use WBS
  • Click on Project Settings
  • Under the Modules section, check the box labeled WBS
  • Click Save

WBS is now enabled for that project.

2. Access the WBS Module

After enabling WBS:

  • Go to the project menu
  • Click on the WBS tab

This will open the WBS interface, showing a mind map-style view of the project’s tasks and subtasks.

Summary

Activating WBS on a project is simple and quick. Once enabled in the project settings, it becomes accessible from the project menu, offering a clear visual breakdown of all tasks in the form of a structured map.